Hello,
I'm, trying to automize my monthly reporting as far as possible. I want to start several packages (Import, AC_Co, CALC_ACC). So far everything works fine, but I when I start the first package, the other package is started right after the request to the server was succesful. This means, the second package is started before the Import package has succeeded.
Any ideas, how to fix this?
Thank you very much in advance.
Regards,