Hi all,
we use BPC packages to load data into our application (we use BPC 10MS SP10).
We want to schedule the execution of this package with an external scheduler such as "Control M" in order to ensure that the input file is uploaded on BPC server before the package is executed.
How can we do this ? What are the prerequisites on the scheduler server ?
thanks for your help,
Romuald