Dear ALL,
I'm working on SAP BPC 10.0 MS Version.
My question is that, what should be the correct sequence of these three SP:
Currency Conversion (SPRUNCONVERSION)
Consolidation (SPRUNCONSO)
Intercompany Elimination (SPRUNELIM)
Right now I put it as sequence of Currency Conversion -> Consolidation -> Intercompany Elim.
Everything works fine for me but just Intercompany Elimination.
I found that the number of Intercompany Elimination only stayed at the base member I assigned (i.e. Elim_Entity) but not copied to the consolidation entity (i.e. CSO) of the desired scope, tho the elimination number calculated is perfect.
I tried to rearrange the sequence of these SP but unfortunately once I did so BPC failed to calculate the elimination.
Can anyone give me some ideas on the above?
Thanks a lot.
Antony